Sequential (177) Electricity Grid
https://johnkamchihau.blogspot.com/2026/09/sequential-binding.html?m=1
.
Ref: https://johnkamchihau.blogspot.com/2026/09/sequential-binding.html?m=1
.
.
.
.
.
John: We've mentioned a lots about Internet. Now, we turned to electricity Grid. See the 2nd picture. It's a frequency mixer. "Alternative current" itself is bilateral. In another words, there're From-the-power plant and to-the-power-plant. Now, See the "to-the-power-plant" in the 2nd picture.
Me: Ok.
John: If we put an address creator there, we can have the physical address of all the "Loads".
Me: Ok.
John: See the 1st picture. I assume that. I have a table of physical address. In the table, I have the address of 4 loading. They are loading A, B, C and D respectively. Why are the signal of loading A and D so weak?
Me: Cause, they are too far away from the power source.
John: Correct. Now, we see the 3rd picture. It is divided into 3 step.
.
Step 1. Normal "from-the-power". Normal "To-the-power-plant".
.
Step 2. Address creation.
.
Step 3. From-the-power-plant. Hacking.


