Sequential (177) Electricity Grid

 https://johnkamchihau.blogspot.com/2026/09/sequential-binding.html?m=1

.

Ref: https://johnkamchihau.blogspot.com/2026/09/sequential-binding.html?m=1

.


.

.
.

.

John: We've mentioned a lots about Internet.  Now, we turned to electricity Grid. See the 2nd picture.  It's a frequency mixer.  "Alternative current" itself is bilateral. In another words,  there're From-the-power plant and to-the-power-plant. Now, See the "to-the-power-plant" in the 2nd picture. 

Me: Ok.

John: If we put an address creator there, we can have the physical address of all the "Loads". 

Me: Ok.

John: See the 1st picture.  I assume that.  I have a table of physical address.  In the table, I have the address of 4 loading.  They are loading A, B, C and D respectively. Why are the signal of loading A and D so weak?

Me: Cause, they are too far away from the power source. 

John: Correct. Now, we see the 3rd picture.  It is divided into 3 step.

.

Step 1. Normal "from-the-power". Normal "To-the-power-plant". 

.

Step 2. Address creation.

.

Step 3. From-the-power-plant. Hacking.